1/14/2009 - Stan fixing the edges between the Kitchen and the Family Room
1/15/2009 - State-of-the-art kitchen complete with toilet
1/15/2009 - 1/2 bath before with the old radiator
1/15/2009 - 1/2 bath before
1/15/2009 - living room
Kitchen
1/17/2009 - Before picture of the closet in the master bedroom
1/24/2009 - Stan cutting wood on the back patio.
1/25/2009 - sealed ceiling vents
1/27/2009 - pet urine stains on the hardwood floor (the black spots)
1/27/2009 - pet urine stains on the hardwood floor (the black spots)
1/28/2009 - Replaced Hardwood Floors where the stains were
1/28/2009 - Replaced Hardwood Floors where the stains were
1/29/2009 - New 'natural' color of the hardwood floors with 1st coat on.
2/1/2009 - 1/2 Bath Floor with new tile and radiator
2/1/2009 - Replaced the pump on the boiler with a more powerful one aand moved it from the return side of the boiler to the supply side to degree the bubbles/noises herd in the radiators while in operation.
2/6/2009 - Patio while being extended.
2/8/2009 - taping around the windows to paint the trim.
2/13/2009 - PATIO AFTER - fixed the missing area that was ripped out when the underground oil storage tank was filled with sludge and extended the patio another 6 feet.
2/13/2009 - PATIO AFTER - fixed the missing area that was ripped out when the underground oil storage tank was filled with sludge and extended the patio another 6 feet.
2/14/2009 - Jon w/Mom painting the office
2/27/2009 - repainted guest bedroom
2/27/2009 - master closet with shelving.
4/10/2009 - Before picture of the attic looking north.
4/10/2009 - Before picture of the attic looking south
4/11/2009 - Old master bath mirror
4/11/2009 - new master bath medicine cabinet.
6/3/2009 - Attic with new floor and insulation looking north.
6/3/2009 - Attic with new floor and insulation looking south.