washdown
snipe washed down
all clean
cleaned up
flipped and ready for bottom work.
cracks and holes to fix.
hull cleaned up and ready to fix.
Laser 2 trailer to be converted to the snipe.
Laser 2 trailer for the Snipe.
hung the mast on the fence.
boats and trailers everywhere.
smashed rail needing repair.
original name painted on.
Jon working on the boat.
measuring the old name.
deck join all cleaned out.
Added a handle to the trailer.
measuring up the bunks for the trailer.
hull traced on the bunks.
The tracing apparatus, foreground.
how we traced the hull
cut bunks fit on the boat.
cut bunks fitted to the boat.
trailer stripped and ready for new bunks.
front bunk in place on trailer.
bunks mounted and carpeted
front bunk
rear bunk
Jess polishing the hull
re-running the halyards in the mast.